SORBO Outdoor Usefu LED Lantern With Emergency Light ,AM/FM Radio For Camping
Delivery term:The date of payment from buyers deliver within days- Price:
Negotiable
- minimum:
- Total supply:
- Delivery term:
The date of payment from buyers deliver within days
- seat:
Beijing
- Validity to:
Long-term effective
- Last update:
2017-12-18 00:12
- Browse the number:
176
Company Profile
- Wenzhou Shengbo Technology Co. Ltd By certification [File Integrity]
-
Contact:
sorbo1(Ms.)
- Telephone:
-
Area:
Beijing
-
Address:
No. 2 Daqing Road, Ouhai Gaoxiang Industrial Zone, Wenzhou, Zhejiang, China (325000)
- Website: http://sorbo1.korea-pack.net/
Product details
Model Number: SB-5029D-C37
Brand Name: SORBO
Key Specifications/Special Features:
SB-5029D SORBO Outdoor Usefu LED Lantern With Emergency Light ,AM/FM Radio For CampingFunction & Feature:Using high-performance radio chip, AM/FM two wave band,voice loudly;Dynamo lighting with high brightness 3 LEDs for spotlight,10 straw-hat lights and 5 red flash lights for camping lantern;Meet demand of long, middle and short lighting. The middle lighting (10 straw-hat lights and 5 red flash lights) can light large area;
Input & Output Charge by USB;
Handle and USB cable storage box design;
Cranking for power, lightweight, low noise, long lifespan, Perfect combination;
Lighting | |
The Max. luminous flux of spotlight | ≥14Lm |
The Max. luminous flux of lantern | ≥32Lm |
3-LED spotlight lighting time after 1 minute cranking | ≥15Min |
10-LED lantern lighting time after 1 minute cranking | ≥6Min |
5-LED red flashing time after 1 minute cranking | ≥40Min |
3-LED spotlight lighting time after being fully charged | ≥10Hr. |
10-LED lantern lighting time after being fully charged | ≥3.5Hr. |
5-LED red flashing time after being fully charged | ≥30Hr. |
Parameters of external power source | |
Input voltage/current | 5V/500mA |
Fully charged time by external power | 2.5-4 Hr. |
Parameters of charging for digital devices | |
Output no-load voltage | 5.1±0.2V |
Output Max. current | 450-500mA |
Shipping Information:
- FOB Port: Shanghai/Ningbo
- Lead Time: 25 - 30 days
Main Export Markets:
- Asia
- Australasia
- Central/South America
- Eastern Europe
- Mid East/Africa
- North America
- Western Europe
New Products
-
Float ball valve Series
price: Negotiable
-
Marble Replacement
price: Negotiable
-
Titanium CNC Milling Parts
price: Negotiable
-
Track Bolt
price: Negotiable
-
316 Stainless Steel Wire Mesh
price: Negotiable
-
Coffee And Espresso Maker
price: Negotiable